Operational funding proposal
Gaza Operational Restoration and Renewal Proposal
A Palestinian led, rights grounded and regionally supported framework for recovery, reconstruction and civilizational repair.
From immediate stabilization to durable renewal.
This proposal presents an integrated pathway for recovery, reconstruction and long-term renewal—grounded in Palestinian leadership, universal rights, regional cooperation and transparent delivery.
Its programme architecture connects urgent humanitarian priorities with governance, infrastructure, livelihoods, education, health, cultural renewal and public accountability.
Table of contents
- Letter of Submission
- Document purpose and status
- Executive summary
- Decision requests
- Proposal architecture
- 1 Strategic context and planning assumptions
- 1.1 Current baseline
- 1.2 Non-negotiable principles
- 1.3 Planning assumptions and decision gates
- 1.4 International and transitional framework
- 1.5 External security and demilitarization parameters
- 2 RLL civilizational diagnostic
- 2.1 Relationship literacy
- 2.2 Worldview analysis
- 2.3 Visions in conflict
- 2.4 Neurotheology and belief systems
- 2.5 Moral intelligence
- 2.6 Humanitarian sustainability
- 2.7 Civilizational diagnostic
- 2.8 Solution package generator
- 2.9 Root-cause synthesis
- 3 Theory of change and programme sequence
- 3.1 First 100 days
- 4 Integrated delivery workstreams
- 4.1 Civilian protection, access and human security
- 4.2 Governance, justice and public administration
- 4.3 Shelter, housing, land and neighbourhoods
- 4.4 Water, sanitation, energy and municipal services
- 4.5 Health, rehabilitation and psychosocial recovery
- 4.6 Education, children, youth and cultural continuity
- 4.7 Food systems, livelihoods and private-sector recovery
- 4.8 Social repair, dialogue and reconciliation
- 4.9 Climate, environment and resilient urban development
- 5 Governance and stakeholder compact
- 5.1 Institutional design
- 5.2 Stakeholder responsibilities
- 5.3 Board of Peace institutional interface
- 5.4 Security sequencing and phase certification
- 5.5 Guarantors and reciprocal obligations
- 6 Financing and economic framework
- 6.1 Fiduciary safeguards
- 7 Monitoring, evaluation and public accountability
- 7.1 Learning and adaptation cycle
- 8 Risk register and mitigation
- 9 Implementation roadmap
- 10 Programme identification and funding request
- 10.1 Funding proposition
- 11 Costed programme budget
- 11.1 Initial eighteen-month cash-flow plan
- 12 Work breakdown structure and accountable delivery
- 12.1 Annual operating cycle
- 13 Organization and staffing plan
- 14 Procurement and contract management plan
- 15 Financial management and internal control
- 16 Environmental social and protection safeguards
- 17 Logical framework and numerical targets
- 18 Donor conditions precedent and disbursement schedule
- 18.1 Tranche authorization
- 18.2 Sustainability and exit
- 19 Conclusion
- Annex A Results chain
- Annex B Minimum project readiness checklist
- Annex C Source framework and references
- Annex D Responsibility and approval matrix
- Annex E Reporting schedule
- Annex F Applicant due diligence and submission data room
- Annex G Priority Starter Portfolio for the first 6 to 18 months
| Proposal horizon | Immediate priority | Planning baseline |
|---|---|---|
| 10 years | Life, dignity, access and institutional continuity | Joint EU–UN–World Bank Gaza RDNA, April 2026 |
| Three implementation phases | Stabilize, restore and transform | $71.4 billion estimated recovery and reconstruction need |
Letter of Submission
President Donald Trump,
I am submitting for your review the Gaza Operational Restoration and Renewal Proposal – a Palestinian-led, rights-grounded, regionally supported ten-year recovery and reconstruction compact. It is designed to align directly with the Comprehensive Plan to End the Gaza Conflict endorsed by the Security Council, and to strengthen the core pillars of your administration’s strategy: civilian protection, verified demilitarization, accountable Palestinian administration, regional burden-sharing, and a durable pathway to stability.
This proposal integrates the Relationship Literacy Lab Civilizational Repair Engine – a diagnostic and implementation framework I developed – into the operational architecture of Gaza’s recovery. Its purpose is simple: to ensure that reconstruction does not fail because the underlying relational, institutional, moral, and humanitarian systems remain broken. By combining your plan’s security and governance commitments with a disciplined civilizational repair approach, the Compact becomes more implementable, more resilient, and more likely to produce lasting stability.
Key elements include:
A three-phase programme (Stabilize, Restore, Transform) aligned to your administration’s sequencing of access, demilitarization, and Palestinian administrative readiness.
A Palestinian-led National Committee for the Administration of Gaza, supported but not replaced by international partners – reinforcing your commitment to lawful Palestinian governance without empowering parallel authorities.
A Recovery Delivery Office that converts the former Gaza Recovery Authority into a technical delivery engine accountable to Palestinian leadership, ensuring transparency, open contracting, and donor confidence.
A Board of Peace interface that preserves your strategic oversight while establishing clear decision rights, verification gates, and a time-bound security mandate for the International Stabilization Force.
A unified results and monitoring framework that measures not only infrastructure outputs but preventable deaths avoided, families safely housed, children learning, livelihoods restored, and verified demilitarization milestones.
Distinct contributions from the Relationship Literacy Lab strengthen your plan in four ways:
1. Relational and worldview diagnostics ensure that reconstruction is not derailed by mistrust, trauma, competing narratives, or institutional fragmentation.
2. Moral-intelligence standards apply one rights-based framework across all actors, reinforcing legitimacy and reducing grievance cycles.
3. Humanitarian sustainability design bridges emergency response to long-term recovery, preventing dependency and accelerating self-reliance.
4. Integrated neighborhood and sector packages convert fragmented projects into coherent, sequenced portfolios with clear owners, safeguards, and measurable outcomes.
Together, your administration’s plan and this proposal form a single, coherent, implementable compact: one that protects civilians, restores lawful Palestinian administration, verifies demilitarization, rebuilds essential systems, honors the deceased and missing, restores childhood, and reduces the risk of renewed conflict.
With humility, I offer this proposal as a practical, rights-grounded, operational pathway that strengthens your strategy and gives Gaza’s families a credible horizon of safety, dignity, and recovery.
Respectfully,
Brian C. Alston
Project Manager
Document purpose and status
This proposal translates the Relationship Literacy Lab Civilizational Repair Engine into an implementation-oriented framework for Gaza and an operational interface with the Comprehensive Plan to End the Gaza Conflict endorsed by United Nations Security Council resolution 2803 (2025). It combines relational, moral, cultural, humanitarian and institutional analysis with a sequenced recovery programme. It is intended to support structured dialogue, financing and programme delivery; it does not replace political negotiations, legally mandated authorities, humanitarian coordination mechanisms or sector-specific engineering assessments.
All implementation is conditional on sustained protection of civilians, reliable humanitarian and commercial access, respect for international law, explosive-ordnance clearance, voluntary and safe movement, and the informed participation of affected Palestinian communities. No person should be displaced, coerced to relocate, or deprived of property or return rights in the name of reconstruction.
Core proposition. Gaza cannot be rebuilt as a collection of construction projects. Durable restoration requires a protected civilian population, a credible Palestinian public authority, accountable security and justice arrangements, functioning markets and services, repaired relationships, and a political horizon that makes renewed destruction less likely. Physical reconstruction and social repair must therefore advance together.
Executive summary
The need.
The April 2026 joint Rapid Damage and Needs Assessment estimates $71.4 billion in recovery and reconstruction needs over ten years, with $26.3 billion required in the first eighteen months. It reports 371,888 housing units destroyed or damaged, more than half of hospitals non-functional, nearly all schools destroyed or damaged, and an 84 percent contraction in Gaza’s economy. These figures describe more than asset loss: they reveal a collapse of the systems through which people secure safety, care, learning, livelihood and confidence in the future.
The response.
A ten-year Gaza Restoration and Renewal Compact should integrate humanitarian action, early recovery, transitional governance, demilitarization, civilian security, reconstruction, economic renewal and reconciliation. It is designed to operate within the Board of Peace architecture while preserving Palestinian leadership, non-displacement, legal accountability and one rights-based standard across actors. The National Committee for the Administration of Gaza should provide day-to-day Palestinian civilian administration; the Board of Peace should provide transitional strategic oversight and donor mobilization; an International Verification Committee-type function should certify phase gates; and the International Stabilization Force should perform only a clearly defined, temporary and accountable security mandate. Palestinian institutions, municipalities and communities must shape priorities and delivery.
The sequence.
Phase I, the first 180 days, protects life and establishes delivery conditions. Phase II, months 6–24, restores essential systems and accountable Palestinian administration. Phase III, years 2–10, rebuilds permanent housing, infrastructure and a productive economy while deepening reconciliation and political settlement. “No-regrets” measures—water, primary care, temporary learning, shelter repair, rubble and explosive-hazard management, cash support and local jobs—begin immediately and scale as access and security permit.
The institutional offer.
The proposal converts the previously described Gaza Recovery Authority into a Recovery Delivery Office accountable to the Palestinian technocratic NCAG, avoiding a parallel governing authority. The Board of Peace would approve the strategic compact and mobilize finance; the Office of the High Representative would coordinate political and institutional interfaces; Palestinian ministries, municipalities and utilities would retain or progressively resume lawful sector mandates; and independent verification would certify milestones. A multi-donor platform should use a single results framework, open contracting, beneficial-ownership disclosure, independent audit, community monitoring and a public project dashboard.
The outcome.
Success is not measured only in kilometres of pipe, megawatts or housing units. It is measured in preventable deaths avoided; families reliably fed and safely housed; children learning, playing and recovering their sense of future; the deceased and missing identified, honored and remembered; livelihoods restored; disputes resolved lawfully; public trust earned; verified demilitarization and withdrawal milestones met without collective punishment; and a credible reduction in the risk of renewed large-scale violence.
Decision requests
1. Endorse the ten-year Compact and authorize a jointly governed 100-day inception process led by Palestinian institutions and supported by regional and international partners.
2. Capitalize a first-eighteen-month financing envelope aligned to the $26.3 billion RDNA requirement, subject to verified project readiness, access and fiduciary safeguards.
3. Establish binding operational arrangements for humanitarian and reconstruction access, civilian protection, deconfliction, medical evacuation, commercial flows and dual-use review.
4. Launch neighbourhood-level damage, tenure, vulnerability and service assessments, with public data standards and accessible claims and grievance mechanisms.
5. Adopt the monitoring framework in this proposal and commission an independent baseline within 90 days.
6. Approve the institutional interface among the Board of Peace, Office of the High Representative, NCAG, Recovery Delivery Office, Palestinian authorities, International Stabilization Force and independent verification function.
7. Authorize a six-month Priority Starter Portfolio, drawn from Annex G, with protected allocations for feeding families, restoring childhood and honoring the deceased and missing.
Proposal architecture
| Element | Function | Primary output |
|---|---|---|
| RLL diagnostic | Explains relational, worldview, moral and systemic causes | Shared problem map and repair priorities |
| Three-phase programme | Sequences action against access, safety and capacity | Investable portfolios and decision gates |
| Nine workstreams | Connects relief, institutions, infrastructure and livelihoods | Sector delivery plans with accountable owners |
| Compact governance | Aligns Palestinian leadership and external support | Transparent authority, finance and oversight |
| Results and learning | Tests whether restoration changes lived conditions | Public scorecard and adaptive management |
| Board of Peace interface | Maps transitional authority, civilian administration, security and verification | Clear decision rights and certified phase gates |
1 Strategic context and planning assumptions
1.1 Current baseline
The proposal uses the April 2026 joint RDNA as its principal reconstruction baseline and later 2026 humanitarian reporting for operational conditions. The baseline is provisional: access, damage and population movements continue to change, and every major capital commitment requires field verification, environmental and social assessment, conflict sensitivity review and updated costing.
| Indicator | Current planning reference | Implication |
|---|---|---|
| Recovery need | $71.4 billion over ten years; $26.3 billion in first 18 months | Finance must be multi-year, pooled and sequenced |
| Housing | 371,888 units damaged or destroyed | Prioritize repairable homes, tenure protection and neighbourhood planning |
| Health | More than half of hospitals non-functional in the RDNA; WHO reported only partial hospital functionality in Sept. 2026 | Pair emergency continuity with network redesign and workforce recovery |
| Education | Nearly all schools damaged or destroyed; 658,000 school-aged children need learning access | Temporary learning and accelerated recovery cannot wait for permanent schools |
| Economy | 84% contraction reported by RDNA; unemployment around 78% in 2025 per World Bank | Use reconstruction to create lawful local jobs and restart firms |
| Food security | OCHA projected 67% facing IPC Phase 3 or worse in Jul–Dec 2026 | Protect aid and restore markets, agriculture and purchasing power |
| Water | UNICEF reported widespread water insecurity and severe collection constraints | Restore bulk supply, wastewater and distributed resilience together |
1.2 Non-negotiable principles
Palestinian leadership and public ownership: affected communities, municipalities, professional bodies, civil society, women, young people and persons with disabilities shape priorities and monitor delivery.
Civilian protection and international law: reconstruction never conditions or substitutes for obligations to protect civilians and civilian objects, enable aid, respect property and prevent forcible displacement.
No reconstruction without conflict-risk reduction: investments use verified deconfliction, continuity plans, insurance or guarantee mechanisms and explicit decision gates.
One recovery system, not parallel empires: partners align behind Palestinian sector strategies, common data and a unified results architecture.
Repair before replace where safe: rapid repair, adaptive reuse and neighbourhood upgrading can return families and services sooner while reducing waste.
Build forward better: infrastructure is safer, greener, maintainable, digitally transparent and resilient to scarcity, climate hazards and service interruptions.
Do no harm and share benefits: procurement, hiring, land decisions and aid targeting are screened for conflict, exclusion, corruption and gender or disability impacts.
Accountability in both directions: authorities and donors disclose decisions and finances; communities have accessible remedies, while implementers receive predictable approvals and funding.
Memory, dignity and honoring the deceased: recovery must support body recovery and identification, dignified burial, truth, mourning and community-led remembrance, while protecting evidence and grave sites.
Celebrating and restoring childhood: every phase must protect children and restore safe learning, play, creativity, family connection and age-appropriate participation in community recovery.
Food security and family nourishment: reliable, nutritious, culturally appropriate food and safe water are non-negotiable foundations for health, learning, dignity and stability.
Transitional security under law: disarmament, tunnel neutralization, withdrawal and international security arrangements must be verified, time-bound, civilian-protective and consistent with international law and Palestinian rights.
1.3 Planning assumptions and decision gates
The plan uses scenarios rather than a single political forecast. Under a constrained-access scenario, activity concentrates on life-saving services, reversible repairs and community delivery. Under a stabilized-access scenario, trunk infrastructure, permanent housing and private investment scale. Under renewed hostilities, programmes shift to continuity-of-operations protocols and protect people, records, inventories and essential assets. Each six-month portfolio review tests four gates: civilian safety, physical access, institutional integrity and technical readiness.
1.4 International and transitional framework
United Nations Security Council resolution 2803 (2025) endorsed the Comprehensive Plan to End the Gaza Conflict, welcomed the Board of Peace as a transitional administration and authorized a temporary International Stabilization Force. The Board of Peace and NCAG were constituted in January 2026. As of September 2026, United Nations reporting indicated that the NCAG had not yet entered Gaza to assume governance functions and that the ISF had not deployed. This proposal therefore distinguishes agreed architecture from operational reality and uses readiness gates before transferring authority, funds or security functions.
Compatibility with the Comprehensive Plan does not waive Palestinian self-determination, the territorial unity of Gaza and the West Bank, non-displacement, property and return rights, humanitarian principles, international law, due process or accountability. The Compact supplies the delivery architecture needed to translate ceasefire and transition commitments into services, livelihoods, institutions and measurable dignity.
1.5 External security and demilitarization parameters
Disarmament benchmarks cover declared and undeclared weapons, command structures, weapons production, transfer routes and armed-group financing, using incentives, safe surrender arrangements, due process and independent verification.
Tunnel and military-infrastructure neutralization begins with mapping and protection of civilians, utilities, heritage, evidence and priority reconstruction sites; methods must prevent collapse, contamination or damage to inhabited areas.
Israeli withdrawal proceeds in verified phases tied to ceasefire compliance and agreed security milestones, with precise maps, dates, notification procedures and remedies for delay or violation.
The ISF mandate must define composition, command, consent, rules on use of force, detention limits, civilian-harm mitigation, complaints, investigation, public reporting and a time-bound transfer to accountable Palestinian security institutions.
No security benchmark may justify starvation, collective punishment, forcible transfer, permanent territorial change or denial of humanitarian relief and essential civilian services.
An independent verification function reports simultaneously to the Board of Peace, NCAG and public, certifies milestones using disclosed criteria and maintains an appeal and incident-review process.
2 RLL civilizational diagnostic
The RLL framework is used here as a disciplined diagnostic—not as a substitute for evidence or local judgment. Its eight modules reveal why a technically sound reconstruction programme can fail if it neglects relationships, identity, moral legitimacy, belief systems, humanitarian systems and institutional resilience.
2.1 Relationship literacy
Diagnostic. Relationships are marked by trauma, bereavement, displacement, mistrust, unequal power and repeated cycles of fear. Institutions also face damaged vertical trust between citizens and authorities and horizontal mistrust among political, social and geographic groups.
Response. Create community liaison and mediation networks; trauma-informed public services; family reunification and protection referrals; structured Palestinian–Israeli technical channels; and feedback systems that close the loop publicly.
2.2 Worldview analysis
Diagnostic. Parties interpret the same events through incompatible histories and narratives of security, dispossession, resistance, victimhood, sovereignty and legitimacy. External actors bring their own strategic and institutional incentives.
Response. Map narratives without demanding false equivalence; distinguish identity needs from negotiable policy positions; train facilitators in cultural humility; and test public communication for dignity, accuracy and incitement risk.
2.3 Visions in conflict
Diagnostic. Competing end states—security control, Palestinian self-determination, governance models, territorial continuity and regional normalization—shape what each party will permit or resist. Reconstruction may be instrumentalized to predetermine political outcomes.
Response. Adopt interim arrangements that preserve lawful final-status options; prohibit demographic engineering; define red lines; create verifiable reciprocal commitments; and connect recovery milestones to a credible political horizon.
2.4 Neurotheology and belief systems
Diagnostic. Religious belief, ritual, sacred space and collective memory can support resilience and compassion or intensify absolutism and exclusion. Trauma heightens threat perception and makes dehumanizing narratives more potent.
Response. Engage credible Muslim, Jewish and Christian leaders; protect worship and heritage; support grief and trauma practices; develop non-coercive peace education; and monitor harmful rhetoric while safeguarding expression and religion.
2.5 Moral intelligence
Diagnostic. Central moral disputes concern civilian protection, justice, responsibility, proportionality, dignity, property, return, accountability and obligations to future generations. Perceived double standards destroy legitimacy.
Response. Use one rights-based standard across actors; publish eligibility rules; provide remedy and appeal; protect whistleblowers; include victim and survivor perspectives; and subject trade-offs to transparent ethical review.
2.6 Humanitarian sustainability
Diagnostic. Emergency dependency coexists with destroyed water, health, shelter, food, energy and market systems. Repeated shocks can trap the response in costly short-term delivery.
Response. Bridge relief to recovery through cash, local procurement, repair, solarized services, workforce retention, public health surveillance, social protection and restoration of commercial supply chains.
2.7 Civilizational diagnostic
Diagnostic. The crisis has degraded governance, education, professional capacity, heritage, economic institutions and expectations that law can protect life. Yet municipal, family, professional and community networks retain substantial adaptive capacity.
Response. Protect institutional memory and civil records; restore rule-based administration; invest in teachers, health workers and engineers; preserve heritage; decentralize continuity capacity; and rebuild civic participation.
2.8 Solution package generator
Diagnostic. Fragmented projects will underperform unless they share assumptions, sequencing, safeguards, data and accountability.
Response. Translate diagnostics into integrated neighbourhood packages, sector portfolios and policy reforms, each with owners, costs, dependencies, milestones, risks and measurable outcomes.
2.9 Root-cause synthesis
The central causal loop is mutually reinforcing: insecurity and unresolved political conflict produce violence and restrictions; violence destroys institutions and livelihoods; destruction and impunity deepen trauma, grievance and extremist recruitment; weak governance and fragmented authority reduce the credibility of nonviolent problem-solving; and economic isolation narrows the constituency for peace. Reconstruction changes this loop only if it simultaneously improves safety, lawful agency, economic opportunity, institutional credibility and relationships across conflict lines, and if grief, memory, nourishment and childhood are woven into public recovery rather than suppressed or treated as secondary.
3 Theory of change and programme sequence
If civilians are protected and movement and material access become reliable; if the Board of Peace transition is translated into accountable Palestinian civilian administration through the NCAG and normal Palestinian institutions; if demilitarization and Israeli withdrawal are reciprocal, verified and rights-compliant; if families are fed, the dead and missing are honored, and children regain safety, learning and joy; if services, homes and livelihoods are restored equitably; and if regional and international actors sustain finance and political guarantees, then Gaza can move from survival and dependency toward dignity, self-reliance and a reduced risk of renewed conflict.
| Phase | Time | Strategic objective | Exit conditions |
|---|---|---|---|
| I Stabilize | 0–180 days | Protect life, reopen access, establish delivery authority and create immediate work | Predictable aid and commercial flows; service minimums; verified project pipeline; public safeguards operating |
| II Restore | 6–24 months | Restore core systems, repair homes and institutions, expand jobs and accountable administration | Reliable essential services; large-scale repair; functioning local administration; declining humanitarian dependency |
| III Transform | Years 2–10 | Deliver permanent reconstruction, productive growth, institutional resilience and reconciliation | Durable housing and infrastructure; sustainable finance; lawful governance and security; measurable trust and opportunity gains |
3.1 First 100 days
1. Constitute an interim Palestinian-led recovery board and secretariat with municipal, civil society, professional, women’s and youth representation; disclose membership, mandates and conflicts of interest.
2. Agree crossing, customs, dual-use, deconfliction, medical evacuation and staff movement service standards with named escalation points and weekly performance reporting.
3. Complete rapid neighbourhood assessments covering structural safety, explosive hazards, tenure, population, vulnerability, water, sanitation, power, health, education, markets and heritage.
4. Launch safe rubble removal and recycling corridors, prioritizing roads to hospitals, water assets, schools and viable housing; integrate missing-person and forensic protocols.
5. Expand water, nutrition, primary care, maternal care, rehabilitation, mental health, shelter repair, temporary learning, protection and cash assistance.
6. Create a recovery jobs facility for debris, repairs, public works, digital records and community services, with transparent wage rates and gender and disability inclusion targets.
7. Publish a prioritized eighteen-month investment plan and procurement pipeline using open contracting data and independent engineering review.
8. Open a multilingual public dashboard and toll-free grievance channel with response deadlines, appeal rights and anti-retaliation protection.
9. Secure donor pledges into a common financing framework and reserve funding for operations, maintenance and institutional capacity—not only visible construction.
10. Commission independent baselines for health, learning, food security, trust, governance, business activity, environmental risk and social cohesion.
11. Establish child-safe learning, play and creative-recovery centres in priority neighbourhoods with trained educators, facilitators, psychosocial workers and disability-inclusive services.
12. Establish predictable high-volume food and water access through protected nutrition corridors, community kitchens, school meals and cash-for-food support so no family is left without nourishment during stabilization.
13. Create a deceased and missing persons coordination unit linking rubble clearance, forensic recovery, identification, family notification, dignified burial, grave-site protection, documentation and community-led remembrance.
4 Integrated delivery workstreams
4.1 Civilian protection, access and human security
Objective. Make safety and lawful access the enabling infrastructure for every other investment.
Priority actions
Maintain sustained humanitarian and commercial entry at scale, with public crossing performance standards and transparent rejection reasons.
Establish a jointly monitored civilian deconfliction system covering facilities, movements, repair crews, food convoys and critical infrastructure.
Scale explosive-hazard survey, marking, clearance and risk education before rubble removal or return; protect grave sites and integrate dignified body-recovery and forensic protocols.
Provide protection case management, legal aid, gender-based violence services, child protection, family tracing and disability-inclusive referrals.
Create continuity plans for renewed violence, including redundant communications, protected stocks, backup power and staff evacuation protocols.
Core measures. Civilian casualty and displacement trends; Crossing throughput and approval time; Percentage of priority sites cleared or risk-assessed; Protection cases safely resolved.
4.2 Governance, justice and public administration
Objective. Restore a legitimate Palestinian public administration that can deliver services, manage funds and resolve disputes under law.
Priority actions
Define decision rights among the Board of Peace, Office of the High Representative, NCAG, Palestinian Authority, Recovery Delivery Office, ministries and municipalities, with a published transition and sunset schedule.
Reconstitute civil registries, land and property records, licensing, payroll and public financial management with secure backups.
Deploy mobile and digital administrative services while rebuilding accessible public facilities.
Establish independent complaints, audit, procurement review and anti-corruption functions.
Restore courts, legal aid and lawful Palestinian policing in phases; prioritize civil documentation, family, housing, property and commercial disputes.
Core measures. Share of population able to access core civil services; Budget and procurement disclosures published on time; Grievances resolved within standard; Court and mediation backlog.
4.3 Shelter, housing, land and neighbourhoods
Objective. Move families from unsafe displacement to secure, serviced and dignified homes without coercion or loss of rights.
Priority actions
Classify buildings for safe occupancy, repair, retrofit or demolition using published standards.
Prioritize owner- and tenant-supported repair of viable homes, rental support and host-family assistance.
Create a property and occupancy claims mechanism that recognizes formal and documented customary evidence and offers appeal.
Plan neighbourhood packages around water, sanitation, streets, schools, clinics, markets, public space and accessibility.
Use local materials and labour where safe; enforce seismic, fire, climate and universal-access standards.
Core measures. Households in safe durable shelter; Repair-to-rebuild ratio; Claims resolved without displacement; Average time from assessment to occupancy.
4.4 Water, sanitation, energy and municipal services
Objective. Restore reliable lifeline systems while reducing single points of failure and operating costs.
Priority actions
Repair wells, bulk connections, desalination, distribution networks and storage; meter production and losses.
Restore wastewater collection, pumping and treatment and prevent discharge into populated and coastal areas.
Rehabilitate solid-waste collection, transfer and treatment; safely manage medical, hazardous and demolition waste.
Deploy solar and storage for clinics, water systems, schools and municipal sites while rebuilding the grid.
Establish asset management, tariffs with social protection, maintenance contracts and spare-parts pipelines.
Core measures. Litres of safe water per person per day; Wastewater safely collected and treated; Hours of electricity to priority services; Waste collection coverage.
4.5 Health, rehabilitation and psychosocial recovery
Objective. Rebuild a connected health system spanning community care, referral hospitals, rehabilitation and public health.
Priority actions
Stabilize medicine, fuel, equipment and workforce supply and expand predictable medical evacuation and return pathways.
Rehabilitate primary-care networks first, linked to maternal, newborn, nutrition, non-communicable disease and mental health services.
Plan hospital reconstruction by catchment, referral need and workforce feasibility rather than replacing every facility exactly as before.
Scale prosthetics, rehabilitation, assistive technology and long-term support for people with life-changing injuries.
Strengthen disease surveillance, laboratories, infection control, health information and emergency preparedness.
Core measures. Functional service availability by catchment; Essential medicine stock-out days; Referral and evacuation completion; Rehabilitation and mental-health coverage.
4.6 Education, children, youth and cultural continuity
Objective. Restore learning immediately and rebuild the human capabilities and cultural confidence required for long-term recovery.
Priority actions
Expand safe temporary learning, accelerated learning and flexible assessment while permanent facilities are planned.
Create Childhood Restoration Zones for safe play, arts, sports, storytelling, music and exploration in every reconstructed neighbourhood.
Support teachers with pay continuity, training, materials, psychosocial support and manageable class sizes.
Integrate early childhood development, daily school feeding, protection, disability inclusion, grief support, arts, sports and civic learning.
Fund child-led gardens, murals and community projects, mobile play and library services, therapeutic sports and an annual Gaza Children’s Day of Joy.
Rebuild technical and higher education around health, construction, engineering, public administration, digital services and enterprise needs.
Document and conserve archives, libraries, heritage and cultural sites with community leadership.
Core measures. Children in regular learning; Learning recovery by age and gender; Childhood Restoration Index covering safety, joy and participation; Teacher retention and attendance; Youth transition to training or work.
4.7 Food systems, livelihoods and private-sector recovery
Objective. Shift progressively from emergency consumption support to purchasing power, production, trade and decent work.
Priority actions
Operate protected, predictable nutrition corridors and transparent commodity tracking for staple food, infant nutrition and therapeutic feeding.
Use family food packages and cash-for-food where markets function, with safeguards against exclusion and price manipulation.
Establish community kitchens and solidarity meals, prioritizing displaced households, pregnant and breastfeeding women, infants, older people, persons with disabilities and chronic-care patients.
Restore bakeries, food markets, agricultural land, irrigation, fisheries, veterinary services, solar cold chains and food safety as access permits.
Provide grants, working capital, guarantees and equipment replacement for micro, small and medium enterprises.
Adopt transparent local-procurement targets and apprenticeships in reconstruction contracts.
Simplify business registration, customs and trade logistics and restore digital payments and banking access.
Core measures. Households with reliable nutritious food; Food basket affordability; Litres of safe water per person per day; Markets and bakeries functioning; Agricultural and fisheries production; Employment and local procurement.
4.8 Social repair, dialogue and reconciliation
Objective. Repair relationships and civic trust while creating nonviolent ways to address grievance, memory and competing narratives.
Priority actions
Establish an Honoring the Deceased and Truth of Loss programme for body recovery, identification, family information, legal recognition of death, dignified burial and protection of grave sites.
Support survivor-centred documentation and physical and digital memorials that name the deceased and missing, preserve evidence and recognize health workers, teachers, aid workers and other community losses.
Provide grief, bereavement and ambiguous-loss support and engage Muslim, Christian, Jewish and other spiritual leaders in non-inciting mourning, prayer and remembrance.
Train local facilitators in mediation, trauma awareness, dialogue and referral; connect them to municipalities and service providers.
Create women- and youth-led local peace initiatives tied to practical service and neighbourhood projects.
Build professional and municipal technical exchanges across Palestinian communities and, when conditions permit, across Palestinian–Israeli lines.
Fund responsible media, rumour management and public communication that humanizes without erasing disagreement.
Core measures. Known deceased with documented identity and location; Families receiving timely information and recognition; Community-led memorial initiatives; Trust in service institutions; Disputes resolved through lawful or mediated channels; Participation diversity.
4.9 Climate, environment and resilient urban development
Objective. Prevent reconstruction from locking Gaza into pollution, scarcity, unsafe density and high operating costs.
Priority actions
Assess contamination, asbestos, hazardous rubble, soil, groundwater and coastal impacts before major works.
Recycle suitable demolition material under tested standards and safe labour protocols.
Use distributed renewable energy, efficient buildings, water reuse, shade and heat-resilient public space.
Protect the coast, aquifer recharge areas, agricultural land and ecological assets through enforceable land-use plans.
Require climate, disaster and environmental risk screening for all investments.
Core measures. Rubble safely processed or recycled; Environmental hotspots remediated; Renewable share in public services; Infrastructure meeting resilience standards.
5 Governance and stakeholder compact
5.1 Institutional design
The recommended model separates political authorization, programme commissioning, implementation, fiduciary assurance and public accountability. Concentrating all functions in one body would create bottlenecks and legitimacy risks; dispersing them without a common framework would recreate fragmentation.
| Body | Role | Safeguard |
|---|---|---|
| Palestinian national authorities | Set policy, law, sector standards and public budgets | Legislative and judicial review; published budgets |
| NCAG | Exercise Palestinian technocratic civilian administration and approve service and recovery priorities | Published mandate; Palestinian composition; due process; transition to normal Palestinian institutions |
| Recovery Delivery Office | Prepare, commission and coordinate recovery portfolios under NCAG authority | Delivery mandate only; no parallel sovereign powers; independent audit |
| Municipalities and service utilities | Plan and operate local assets and services | Performance agreements; citizen oversight; capacity support |
| Community recovery councils | Validate needs, monitor works and resolve local issues | Inclusive selection; conflict-of-interest disclosure; public minutes |
| Multi-donor platform | Pool or align finance and agree common conditions | No parallel policy mandates; transparent allocations |
| Independent assurance panel | Audit engineering, finance, safeguards and results | Public reports; unrestricted access to records |
| Access and deconfliction mechanism | Resolve movement, material and safety constraints | Published service standards and escalation outcomes |
5.2 Stakeholder responsibilities
| Stakeholder | Primary responsibilities |
|---|---|
| Palestinian institutions | Lead policy, community consent, service delivery, public finance, staffing, regulation and accountability. |
| Palestinian civil society and communities | Co-design priorities, reach excluded groups, monitor delivery, mediate disputes and provide feedback. |
| Israel | Enable predictable humanitarian and commercial access, movement, utilities and reconstruction materials; protect civilians and works; cooperate on deconfliction, trade and technical security arrangements consistent with law. |
| United States | Use diplomatic leverage and finance to sustain access and ceasefire arrangements; support guarantees, pooled funding, oversight and regional alignment. |
| Egypt, Jordan and Arab partners | Support mediation, border and logistics capacity, training, energy, finance, markets and the Arab recovery framework. |
| Qatar, UAE, Saudi Arabia and other donors | Provide multi-year capital and operating finance aligned to common safeguards and Palestinian priorities. |
| United Nations | Coordinate humanitarian and early recovery action; provide sector expertise, protection functions, data standards and fiduciary support. |
| EU, World Bank and international financial institutions | Provide assessments, grants, guarantees, technical assistance, private-sector instruments and public-finance support. |
| NGOs, Red Cross and Red Crescent Movement | Deliver principled assistance, specialized services, local capacity and independent field feedback. |
| Private sector and diaspora | Supply investment, expertise, technology, trade links, jobs and competitive delivery under transparent rules. |
5.3 Board of Peace institutional interface
| Framework institution | Compact function | Operational boundary |
|---|---|---|
| Board of Peace | Approve transitional strategy, mobilize finance, resolve high-level impediments and receive verified phase reports | Does not replace community participation, technical appraisal, independent audit or the ultimate transfer to legitimate Palestinian governance |
| Office of the High Representative | Coordinate the Board, NCAG, Israel, Palestinian Authority, guarantors, donors and ISF | Uses written decision logs and escalation protocols; cannot direct humanitarian targeting or override safeguards |
| NCAG | Lead day-to-day Palestinian civilian administration, services, public staffing and recovery priorities | Operates transparently, draws on existing Palestinian systems and follows a published transition plan |
| Recovery Delivery Office | Convert NCAG priorities into costed programmes, procurement, contracts, schedules and results | Commissioning and coordination only; time-limited and subject to audit |
| International Stabilization Force | Provide temporary security support, protect agreed corridors and enable demilitarization under its mandate | Civilian protection, necessity, proportionality, complaints, investigation, detention safeguards and sunset conditions apply |
| Independent verification function | Certify disarmament, withdrawal, access, governance and delivery milestones | Publishes criteria, evidence summaries, dissent and corrective actions; separates verification from political approval |
| Palestinian Authority, ministries and municipalities | Maintain legal and institutional continuity and progressively resume ordinary functions | No permanent fragmentation between Gaza and the West Bank; mandates and transfers are documented |
5.4 Security sequencing and phase certification
1. Freeze and map: maintain the ceasefire; identify forces, weapons, tunnels, restricted areas, civilian sites and reconstruction corridors; agree maps, baseline evidence and incident notification.
2. Secure civilians and essential flows: protect aid, food, water, medical evacuation, utilities, markets and work sites while vetted Palestinian civilian police and ISF capabilities are prepared.
3. Implement verified demilitarization: conduct weapons surrender, storage or destruction and tunnel neutralization under transparent technical protocols, with safeguards for civilians, infrastructure and evidence.
4. Execute reciprocal withdrawal: verify Israeli redeployment against mapped milestones and time frames, alongside demonstrated security compliance and uninterrupted humanitarian access.
5. Transfer and normalize: move public-order functions to accountable Palestinian institutions, narrow and end the ISF mandate, remove exceptional restrictions and maintain independent incident monitoring.
Certification requires corroborated evidence, an opportunity for affected parties to respond, a published finding and a corrective-action route. Civilian relief and indispensable services continue regardless of political disagreement or a delayed milestone.
5.5 Guarantors and reciprocal obligations
Israel: maintain the cessation of military operations; carry out verified withdrawal; enable humanitarian and commercial access, movement, utilities and reconstruction materials; protect civilians and notified reconstruction sites; and provide timely, reasoned security decisions.
United States: sustain diplomatic guarantees, Board of Peace performance, ceasefire compliance, resource mobilization and consequences for obstruction by any party.
Egypt, Qatar and Türkiye: continue ceasefire mediation and guarantor functions, support dispute resolution, border and logistics arrangements, and rapid response to violations.
Jordan, Arab partners, European Union and other states: provide training, finance, trade access, technical support, monitoring and political cover for Palestinian institutional continuity and a credible political horizon.
United Nations, World Bank and international financial institutions: supply legal and technical standards, humanitarian coordination, recovery finance, data, safeguards and independent evidence without duplicating Palestinian systems.
All parties: protect non-displacement, property, return, family unity and equal humanitarian access; reconstruction finance may not be conditioned on unlawful political concessions.
6 Financing and economic framework
The financing strategy should use the $71.4 billion ten-year RDNA estimate as a planning envelope, not a blank cheque. Each programme must pass readiness, safety, economic, environmental, social and maintenance tests. The first-eighteen-month requirement of $26.3 billion should be converted into a rolling portfolio with quarterly commitment and disbursement forecasts.
| Window | Purpose | Instrument |
|---|---|---|
| Human survival and protection | Food, health, WASH, shelter, cash and protection | Humanitarian grants and rapid pooled funds |
| Early recovery and public services | Repairs, rubble, municipal services, temporary learning, jobs | Grants, results-based financing and service contracts |
| Core infrastructure and housing | Permanent systems and neighbourhood reconstruction | Concessional finance, grants and guarantees |
| Private-sector restart | Working capital, equipment, trade and investment | Grants, credit lines, guarantees, equity and political-risk cover |
| Institutional and social repair | Public administration, justice, mediation, culture and accountability | Long-horizon grants and technical assistance |
6.1 Fiduciary safeguards
Publish all projects, budgets, awards, milestones, change orders and beneficial owners using open contracting standards.
Use independent cost estimation, engineering verification, geotagged progress evidence and risk-based audits.
Screen sanctions and diversion risks without excluding legitimate Palestinian firms or delaying life-saving delivery.
Separate project selection, procurement, payment authorization, verification and audit responsibilities.
Create confidential whistleblowing, fraud investigation, restitution and debarment procedures.
Track distributional equity by geography, displacement status, sex, age, disability and poverty level.
Fund operations and maintenance, institutional salaries and asset management alongside capital works.
7 Monitoring, evaluation and public accountability
A single results framework should connect humanitarian outcomes, service restoration, institutional performance, economic recovery, social repair and conflict-risk reduction. Baselines must be independently established and disaggregated. Targets should be revised transparently as access and field verification improve.
| Outcome domain | Illustrative 24-month indicators | Verification |
|---|---|---|
| Safety and protection | Reduced civilian harm and displacement; priority areas risk-assessed for explosive hazards | OCHA and protection monitoring; independent incident review |
| Basic services | Safe water, electricity, primary care, waste collection and learning availability by locality | Utility records, facility surveys and household sampling |
| Housing and return | Households in safe shelter; repair completion; tenure claims resolved | Engineering certification, occupancy checks and claims registry |
| Governance | Budget execution, procurement transparency, grievance resolution and service satisfaction | Audit, public dashboard and perception surveys |
| Economy | Employment, firm survival, local procurement, trade flow and food affordability | Labour and enterprise surveys, customs and market data |
| Social repair | Institutional trust, perceived dignity, mediated disputes and inclusive participation | Repeated representative surveys and qualitative panels |
| Family nourishment | Food reliability, dietary quality, safe water, market affordability and equitable access | Household survey, nutrition surveillance, market monitoring and distribution audits |
| Childhood restoration | Safety, regular learning, play, creative participation, psychosocial recovery and disability inclusion | Child-sensitive surveys, education records, programme data and independent safeguarding review |
| Memory and mourning | Identification and family notification, dignified burial, protected grave sites and community-led remembrance | Forensic and civil records, family feedback, site audits and memorial registers |
| Transition and security | Ceasefire, access, demilitarization, withdrawal, ISF conduct and transfer milestones | Independent verification reports, incident review, geospatial evidence and public certification |
| Sustainability | Asset functionality, maintenance funding, renewable energy, water losses and safe rubble processing | Asset audits and environmental monitoring |
7.1 Learning and adaptation cycle
1. Monthly operational review: access, safety, delivery bottlenecks and corrective actions.
2. Quarterly portfolio review: expenditure, outputs, safeguards, distributional equity and public feedback.
3. Six-month strategic review: scenario, decision gates, outcome trends, political risks and reprioritization.
4. Annual independent review: value for money, institutional integrity, social impact and conflict sensitivity.
5. Two-year public renewal conference: Palestinian-led assessment of whether the Compact should continue, change or end.
8 Risk register and mitigation
| Risk | Effect | Mitigation |
|---|---|---|
| Renewed hostilities | Loss of life, asset destruction and programme suspension | Protection diplomacy, deconfliction, continuity plans, modular assets and decision gates |
| Access restrictions and approval delays | Interrupted supply chains and rising cost | Published service standards, pre-cleared catalogues, escalation mechanism and diversified routes |
| Governance fragmentation | Competing mandates and low legitimacy | Time-bound compact, legal clarity, shared results and inclusive oversight |
| Diversion, corruption or elite capture | Loss of resources and trust | Open contracting, beneficial ownership, independent audit, grievance and sanctions |
| Land and property disputes | Exclusion, delayed works and secondary displacement | Claims mechanism, legal aid, interim occupancy rules and appeal |
| Unequal geographic or social benefit | Grievance and instability | Transparent vulnerability formula, disaggregated monitoring and community review |
| Donor fragmentation or fatigue | Unfinished assets and recurrent gaps | Multi-year pledges, pooled windows, common reporting and maintenance reserves |
| Skills and institutional capacity loss | Poor quality and slow delivery | Diaspora return pathways, apprenticeships, salary continuity and embedded technical support |
| Environmental and explosive hazards | Injury, contamination and unsafe rebuilding | Survey before works, tested debris protocols, remediation and worker protection |
| Politicized narratives and misinformation | Threats, obstruction and reduced consent | Transparent communication, trusted messengers, rumour tracking and independent media |
| Security transition harms civilians or becomes open-ended | Loss of life, legitimacy and Palestinian agency | Published mandate, civilian-harm policy, complaints, independent investigation, phase gates and sunset review |
| Demilitarization or withdrawal stalls | Renewed insecurity and blocked reconstruction | Reciprocal milestones, independent verification, guarantor escalation and protected continuation of essential relief |
| Erasure of the deceased, missing or evidence | Family trauma, injustice and distrust | Forensic protocols, grave-site protection, chain of custody, family liaison and community-led memorialization |
9 Implementation roadmap
| Period | Priority deliverables | Lead configuration |
|---|---|---|
| Days 0–30 | Interim authority; access standards; emergency service plan; public dashboard design; rapid assessment protocol | Palestinian authorities and municipalities with UN, regional and donor support |
| Days 31–100 | Neighbourhood baselines; rubble and hazard corridors; repair, learning, health and jobs expansion; first investment pipeline | NCAG approves; Recovery Delivery Office commissions; sector institutions and partners deliver |
| Months 4–6 | Financing platform operational; claims and grievance systems; utility stabilization; procurement packages tendered | Palestinian finance and sector bodies with independent assurance |
| Months 6–18 | Large-scale housing repair; trunk-service rehabilitation; facility networks; SME restart; governance transition | Palestinian institutions, utilities, firms and international partners |
| Months 18–24 | Permanent reconstruction acceleration; service standards normalized; humanitarian caseload reduced | Public institutions and market actors increasingly lead |
| Years 2–5 | Neighbourhoods, hospitals, schools, infrastructure and productive sectors rebuilt at scale | National and municipal delivery with regional investment |
| Years 5–10 | System completion, climate resilience, economic integration, institutional consolidation and evaluation | Palestinian institutions with normal development partnerships |
10 Programme identification and funding request
| Field | Operational specification |
|---|---|
| Lead applicant | [Lead Applicant legal name, registration number and country] |
| Co-applicants | Palestinian public institutions, municipalities, civil-society organizations, UN and technical partners selected through due diligence |
| Programme area | All five Gaza governorates, prioritized by verified vulnerability, access, safety and service-gap data |
| Primary participants | Approximately 2.1 million residents, with targeting safeguards for displaced households, children, women, older people and persons with disabilities |
| Implementation period | 120 months, with an initial binding financing period of 18 months and six-month decision gates |
| Total programme envelope | $71.4 billion over ten years, aligned to the April 2026 joint RDNA |
| Initial funding request | $26.3 billion for months 1–18, released through performance- and readiness-based tranches |
| Currency and price basis | United States dollars, 2026 constant prices; inflation, exchange-rate and security contingencies updated quarterly |
| Reporting language | English and Arabic, with public summaries and accessible grievance information |
Applicant condition.
The programme can be submitted only after the lead applicant completes the legal, fiduciary, safeguarding and sanctions due-diligence schedule in Annex F. Until the applicant is named, this document is operationally complete but not executable as a grant agreement. The placeholder does not authorize any organization to represent that it has been selected or endorsed.
10.1 Funding proposition
Donors are requested to finance a single coordinated portfolio rather than isolated projects. Commitments may be pooled, parallel or delegated, but every award must use the common results framework, geographic prioritization method, safeguards, open-contracting rules and independent verification protocol. The initial request covers life-saving continuity, early recovery and the first wave of permanent restoration; later capital commitments are approved only after field verification and phase-gate review.
11 Costed programme budget
The following budget is a planning allocation derived from the joint RDNA envelope and operational sequencing. It is suitable for donor appraisal and portfolio formation, but individual projects require bills of quantities, field verification and procurement-specific cost estimates before contract award.
| Budget component | Months 1–18 USD bn | Ten-year USD bn | Cost basis and deliverables |
|---|---|---|---|
| Protection, food and social assistance | 3.20 | 4.80 | Cash and in-kind assistance, protection services, medical evacuation and continuity stocks |
| Housing and neighbourhood recovery | 7.00 | 22.00 | Structural assessment, repair, rental support, claims, permanent housing and neighbourhood infrastructure |
| Water and sanitation | 2.50 | 7.00 | Bulk supply, wells, desalination, networks, wastewater treatment and asset management |
| Energy and digital continuity | 1.60 | 5.00 | Grid restoration, distributed solar and storage, priority facilities and communications |
| Health and rehabilitation | 1.80 | 6.00 | Primary care, hospitals, medicines, workforce, rehabilitation, mental health and surveillance |
| Education and human capital | 1.50 | 5.00 | Temporary learning, school reconstruction, teachers, TVET, universities and early childhood services |
| Municipal services, transport and rubble | 2.00 | 7.00 | Explosive-hazard management, debris, roads, drainage, waste and municipal equipment |
| Livelihoods, firms, agriculture and trade | 2.30 | 8.00 | Public works, enterprise grants and finance, agriculture, fisheries and trade logistics |
| Governance, justice and institutional capacity | 0.90 | 2.00 | Administration, public finance, civil records, legal aid, courts, policing and digital government |
| Social repair, culture and reconciliation | 0.50 | 2.00 | Mediation, psychosocial recovery, culture, heritage, communications and civic participation |
| Environment and climate resilience | 0.40 | 3.00 | Contamination assessment, remediation, coastal and aquifer protection, climate adaptation |
| Programme management, assurance and contingency | 2.60 | 4.60 | Programme office, monitoring, independent verification, insurance and managed contingencies |
| Total | 26.30 | 76.40 | Gross planning portfolio before expected savings and financing optimization |
| Less efficiencies and co-financing | 0.00 | (5.00) | Local procurement, blended finance, existing commitments and portfolio efficiencies |
| Net funding envelope | 26.30 | 71.40 | Aligned to the April 2026 joint RDNA |
11.1 Initial eighteen-month cash-flow plan
| Period | Funding need USD bn | Cumulative USD bn | Release condition |
|---|---|---|---|
| Months 1–3 | 4.20 | 4.20 | Legal agreements, access protocol, emergency portfolio and fiduciary controls effective |
| Months 4–6 | 4.60 | 8.80 | Verified baselines, procurement plan, safeguards and first independent assurance report |
| Months 7–12 | 8.40 | 17.20 | Service and repair milestones achieved; open-contracting and grievance data current |
| Months 13–18 | 9.10 | 26.30 | Midterm outcome review, updated RDNA, satisfactory audit and next-phase investment pipeline |
Budget controls.
Transfers between budget components above 10 percent require board approval and donor no-objection. The contingency window may finance only documented price, access, security or design changes and may not cover unsupported cost overruns. Interest and foreign-exchange gains return to programme purposes. Unspent balances are carried forward only against an approved work plan.
12 Work breakdown structure and accountable delivery
| Package | Months 1–6 deliverable | Months 7–18 deliverable | Accountable owner |
|---|---|---|---|
| WP1 Access and protection | Access standards, deconfliction roster, medical evacuation and hazard mapping | Predictable crossing performance and cleared priority corridors | Protection and Access Director with UN and relevant authorities |
| WP2 Housing and neighbourhoods | 250,000 building assessments and first repair grants | 150,000 households in safer repaired, transitional or durable accommodation | Housing Director, municipalities and Housing Council |
| WP3 WASH and municipal systems | Emergency production, trucking reduction plan and critical sewer repairs | Minimum safe-water service across accessible localities and priority wastewater assets restored | Infrastructure Director and utilities |
| WP4 Health and rehabilitation | Medicine pipeline, primary-care stabilization and referral protocol | Catchment-based network operating with rehabilitation and mental-health expansion | Health Director and Ministry of Health |
| WP5 Education and youth | Temporary learning scale-up and teacher roster | At least 500,000 children in regular learning pathways; TVET linked to recovery jobs | Human Development Director and education authorities |
| WP6 Economy and livelihoods | 100,000 paid public-work or service opportunities and firm intake | 250,000 cumulative work opportunities; enterprise finance and trade logistics operating | Economic Recovery Director and private-sector facility |
| WP7 Governance and justice | NCAG support, Recovery Delivery Office, digital registry backup, audit and grievance functions | Core civil services, claims, legal aid and transparent budgeting operating | Institutional Recovery Director |
| WP8 Social repair and culture | Local facilitator network and protection-linked dialogue pilots | Community recovery councils active in all accessible municipalities | Social Recovery Director and civil society partners |
| WP9 Environment and resilience | Hazard protocols and contamination baseline | Certified debris processing and climate-resilient design standards in all capital projects | Environmental Safeguards Director |
12.1 Annual operating cycle
1. October–November: refresh needs, access scenarios, unit costs and the three-year rolling investment plan.
2. December: approve annual results, procurement, staffing, risk and cash-flow plans and publish the citizen budget.
3. January–September: implement through quarterly work plans, monthly payment forecasts and contract-level milestone tracking.
4. Quarterly: verify physical and financial progress, publish contracts and grievances, and authorize the next disbursement.
5. Annually: independent financial audit, engineering audit, safeguards review, value-for-money assessment and public hearing.
13 Organization and staffing plan
The Recovery Delivery Office functions under NCAG authority as a commissioning and coordination entity rather than a replacement ministry or parallel government. Its core office is capped, while sector institutions, municipalities, utilities, firms and civil-society partners implement programmes. Staffing is merit-based, competitively recruited and subject to conflict-of-interest and asset-declaration rules.
| Function | Indicative core FTE | Principal responsibilities |
|---|---|---|
| Executive and board secretariat | 8 | Strategy, legal mandate, board decisions, donor and government relations |
| Programme and portfolio management | 18 | Work plans, dependencies, phase gates, issue resolution and change control |
| Engineering and infrastructure assurance | 20 | Design review, costing, contract oversight, asset and maintenance standards |
| Finance, treasury and grants | 18 | Budgeting, accounting, cash, grants, audit liaison and donor reporting |
| Procurement and contract management | 16 | Market analysis, tendering, award, performance, claims and open-contracting data |
| Monitoring, evaluation and data | 15 | Baselines, dashboards, surveys, verification, evaluation and geospatial data |
| Safeguarding, environment and social performance | 20 | Protection, SEA/SH, child safety, disability, land, environment and grievances |
| Legal, integrity and investigations | 12 | Legal review, ethics, whistleblowing, fraud response and sanctions screening |
| Community engagement and communications | 16 | Consultation, local councils, public information, feedback and rumour management |
| ICT, security and administration | 17 | Systems, cyber and information security, facilities, HR and operational support |
| Total core office | 160 | Scales down as normal institutions assume functions |
Key-person requirement.
Before first disbursement the programme must appoint an accountable officer, chief financial officer, procurement director, safeguards director, monitoring director, internal-audit head and complaints commissioner. Acting appointments may not exceed 120 days. At least 50 percent of management posts should be held by women, subject to an open and competitive process, and all teams must include persons with disability expertise.
14 Procurement and contract management plan
| Procurement class | Indicative method | Control and publication |
|---|---|---|
| Emergency goods and services | Frameworks, direct selection only where justified, or accelerated competition | Written emergency justification, price verification and award publication within 10 working days |
| Works below $5 million | National or regional open competition with standardized documents | Independent bid opening, beneficial ownership and geotagged milestone verification |
| Works $5–50 million | International open competition or prequalified design-build | Independent technical panel, integrity pact and contract disclosure |
| Works above $50 million | International competitive procurement with lender review | Prior donor review, environmental and social instruments, independent engineer and dispute board |
| Consulting services | Quality- and cost-based selection; qualifications for small assignments | Terms, evaluation, award and deliverables published subject to protected data |
| Community contracting | Simplified grants or contracts to verified local entities | Standard rates, community validation, spot checks and social audit |
The annual procurement plan identifies package, method, estimated value, market approach, safeguards, review level and planned dates.
No bidder may design specifications it later bids against unless the conflict is disclosed and mitigated under donor rules.
All bidders disclose beneficial owners, agents, political exposure and material litigation; subcontractors receive equivalent screening.
Contract modifications above 15 percent, cumulative, require independent cost review and board or donor approval.
Payments are tied to independently verified milestones; advance payments require guarantees and are recovered pro rata.
A procurement complaints panel issues reasoned decisions within 20 working days without delaying urgent life-saving procurement unless material harm is likely.
15 Financial management and internal control
The programme will use a segregated treasury structure with a single chart of accounts mapped to donor agreements and work packages. Funds flow from trustee or donor accounts to controlled programme accounts and then to verified vendors, grant recipients or beneficiaries. Cash is forecast monthly and reconciled daily for high-volume payment channels and at least monthly for all bank accounts.
| Control area | Minimum operating requirement | Evidence |
|---|---|---|
| Budget authorization | Approved annual and quarterly budgets with commitment controls | Board minutes and system budget reports |
| Payments | Maker-checker approval, vendor validation and three-way match | Purchase order, receipt, invoice and payment record |
| Payroll | Verified roster, attendance or deliverables, bank transfer and duplicate testing | HR file, payroll register and exception report |
| Cash assistance | Unique beneficiary control, consent, secure payment and post-distribution monitoring | Reconciled payment file and sample verification |
| Assets and inventory | Barcode or serial register, custody, insurance and physical counts | Asset register and count reports |
| Subgrants | Risk rating, milestone agreements, capacity support and expenditure verification | Due diligence, grant file and assurance report |
| Audit | Risk-based internal audit and annual independent external audit | Published audit and time-bound management response |
Fraud response.
Credible allegations trigger confidential triage within five working days. Management preserves evidence, protects reporters, suspends affected payments where proportionate, refers criminal conduct to competent authorities and pursues recovery. Substantiated cases and corrective actions are reported to the board and donors subject to due-process and privacy requirements.
16 Environmental social and protection safeguards
| Risk domain | Required instrument | Approval point |
|---|---|---|
| Land, property and displacement | Land and occupancy due diligence, claims plan and resettlement prohibition or approved lawful remedy | Before site acquisition or works |
| Explosive remnants and structural safety | Hazard assessment, clearance certification and structural assessment | Before access by workers or residents |
| Environmental contamination | Environmental and social assessment and management plan | Before design approval and tender |
| Labour and worker safety | Labour management plan, code of conduct, PPE and incident protocol | Before mobilization |
| Sexual exploitation, abuse and harassment | SEA/SH prevention and survivor-centred referral plan | Before partner or contractor onboarding |
| Child safety | Child safeguarding, safe recruitment and referral protocol | Before child-facing activities |
| Data and digital systems | Data-protection impact assessment and role-based access | Before collection or system launch |
| Cultural heritage | Chance-find and conservation plan with community and expert input | Before demolition, excavation or restoration |
Serious incidents involving death, grave injury, exploitation, abuse, major environmental harm or security breach are reported to programme leadership within 24 hours and to donors within the applicable agreement deadline. Investigation and survivor support take precedence over reputational management.
17 Logical framework and numerical targets
| Result and indicator | Baseline | Month 18 target | Year 5 target | Means of verification |
|---|---|---|---|---|
| Impact 1 Population with reliable access to essential services | To be independently established in first 90 days | At least 80% in accessible areas | At least 95% territory-wide | Representative household and facility surveys |
| Outcome 1 People facing IPC Phase 3 or worse | 1.4 million projected for Jul–Dec 2026 | Below 700,000, subject to access and market conditions | Below 10% of population | IPC analysis and market monitoring |
| Outcome 2 Households in safe shelter or housing | Baseline by neighbourhood assessment | 150,000 households assisted into safer accommodation | All eligible households offered durable solution | Occupancy and engineering verification |
| Outcome 3 Children in regular learning pathways | 658,000 school-aged children require restored access | At least 500,000 enrolled with minimum attendance standard | Universal access with measured learning recovery | Education information system and independent assessment |
| Outcome 4 Priority health service availability | No hospital fully functional in Sept. 2026 reporting | Essential primary and referral package available in every accessible catchment | Resilient referral network meeting national standards | WHO HeRAMS and facility verification |
| Outcome 5 Paid work opportunities created | Baseline at inception | 250,000 cumulative opportunities, at least 30% for women and 5% disability-inclusive | Sustained private employment exceeds public works | Payroll, labour surveys and enterprise data |
| Outcome 6 Procurement value awarded to Palestinian firms | Baseline at inception | At least 40% where capacity and competition permit | At least 60% | Open-contracting records and audits |
| Outcome 7 Grievances resolved within service standard | No unified mechanism | At least 80% within 30 days | At least 90% | Case system and complainant follow-up |
| Outcome 8 Public confidence in recovery fairness | Baseline survey in first 90 days | 10-point improvement | 25-point improvement | Repeated representative perception survey |
| Outcome 9 Family Food Security Index | Baseline in first 60 days | No accessible locality below agreed emergency food and safe-water minimums; measurable improvement in diet quality | Severe food insecurity below 5% with functioning local markets | Household, nutrition, water and market monitoring |
| Outcome 10 Childhood Restoration Index | Baseline by age, sex and disability in first 90 days | At least 70% of children regularly access safe learning, play or creative recovery | Universal access and sustained gains in safety, joy and learning | Child-sensitive survey, education and safeguarding review |
| Outcome 11 Deceased and missing persons cases | Unified baseline and case registry in first 90 days | All reported cases registered; priority recovery and identification cases actively processed | All feasible cases resolved or maintained under transparent family liaison | Forensic, civil registry, family feedback and independent audit |
| Outcome 12 Verified transition milestones | Baseline maps and criteria agreed at inception | All certified findings published with corrective actions and no interruption of essential relief | Security functions normalized under accountable Palestinian institutions | Independent verification, incident review and public certification |
Target qualification.
Targets are management commitments only within verified access, security and funding assumptions. Baseline studies may justify revision within 120 days, but any reduction requires published reasoning and donor approval. No target may incentivize unsafe return, coerced relocation, inflated enrollment, under-reporting of harm or exclusion of high-cost participants.
18 Donor conditions precedent and disbursement schedule
| Condition precedent | Required evidence | Deadline |
|---|---|---|
| Legal and governance authority | Founding instrument, board charter, delegations and conflict-of-interest register | Before grant signature |
| Applicant and partner due diligence | Registration, audited accounts, sanctions, ownership, safeguarding and litigation disclosures | Before grant signature |
| Access and protection arrangements | Signed operating protocol with escalation and deconfliction procedures | Before first disbursement |
| Financial management system | Chart of accounts, bank mandates, accounting system, manual and internal audit plan | Within 30 days |
| Procurement system | Procurement manual, annual plan, review thresholds and complaints panel | Within 30 days |
| Safeguards framework | Environmental, social, labour, protection, SEA/SH, child and grievance frameworks | Before affected activities |
| Results baseline | Independent baseline, target validation and data-protection controls | Within 90 days |
| First portfolio | Costed work plans, designs or specifications, risk ratings and verification plan | Before relevant tranche |
18.1 Tranche authorization
Each tranche is authorized by the board after the chief financial officer certifies eligible cash need, the programme director certifies progress, the safeguards director confirms compliance and the independent verifier reports no material exception. Donors receive the package at least ten working days before release. Material adverse findings trigger a corrective-action plan, partial release, reallocation or suspension rather than automatic termination of essential services.
18.2 Sustainability and exit
Assets transfer to legally competent Palestinian institutions with records, warranties, maintenance plans, trained staff and funded operating budgets.
Temporary parallel services close only after an accessible public or contracted service meets agreed continuity and quality standards.
The NCAG and Recovery Delivery Office transfer functions to Palestinian ministries, municipalities, utilities and normal development institutions under an approved transition plan.
Subsidies become targeted and fiscally transparent; tariffs are introduced only with affordability protection and reliable service.
Local firms, professional bodies and training institutions retain skills, equipment and standards developed through reconstruction.
A final independent evaluation measures outcomes, unintended effects, sustainability, value for money and lessons for future recovery.
19 Conclusion
Gaza’s restoration is feasible only as a compact between people, institutions and states—not as a construction campaign imposed on a damaged society. The practical starting point is to protect life, make access reliable, restore Palestinian agency and deliver visible improvements through accountable local systems. The strategic test is whether each investment reduces dependency, strengthens lawful institutions, repairs relationships and makes renewed destruction less likely.
The RLL framework adds value by insisting that material repair and civilizational repair are inseparable. Water networks fail without governance and maintenance. Schools fail without safety and teachers. Housing fails without tenure and community. Dialogue fails without justice and tangible change. A credible proposal therefore binds infrastructure, institutions, relationships, moral legitimacy and political possibility into one sequenced programme.
The immediate decision is not whether every final-status question has been solved. It is whether responsible actors will establish the conditions, authority, financing and accountability needed to save lives now and create a credible path from emergency to renewal.
Annex A Results chain
| Level | Statement |
|---|---|
| Impact | People in Gaza live with dignity, safety, rights, opportunity and resilient public systems within a durable political settlement. |
| Outcomes | Civilian harm declines; services and housing recover; legitimate Palestinian institutions function; livelihoods expand; social trust and lawful dispute resolution improve. |
| Outputs | Access mechanisms, repaired assets, public services, jobs, claims systems, transparent finance, protection services, learning and dialogue platforms operate. |
| Activities | Assessment, clearance, repair, construction, cash, procurement, training, institutional reform, mediation, monitoring and public communication. |
| Inputs | Political guarantees, Palestinian leadership, community participation, finance, access, data, technical expertise, materials and workforce. |
Annex B Minimum project readiness checklist
Verified need, location, beneficiaries and alternatives analysis.
Clear institutional owner and post-completion operator.
Access, deconfliction and explosive-hazard status confirmed.
Land, property, occupancy and displacement risks assessed.
Technical design, cost estimate and procurement strategy independently reviewed.
Environmental, social, protection, gender and disability safeguards approved.
Operations, maintenance, staffing, energy and spare-parts plan funded.
Local labour, firm participation and skills-transfer plan defined.
Outputs, outcomes, baselines, verification and public disclosure specified.
Grievance, appeal, fraud reporting and remedy channels operational.
Contingency and continuity plan established for access or security deterioration.
Annex C Source framework and references
Figures and institutional references should be refreshed before formal submission or funding decisions. The source document supplied with the assignment was used for the RLL architecture; current quantitative claims were taken from authoritative institutional publications listed below.
1. European Union, United Nations and World Bank. Final Gaza Rapid Damage and Needs Assessment, April 2026. https://palestine.un.org/en/314095-final-gaza-rapid-damage-and-needs-assessment-estimates-714-billion-recovery-and
2. World Bank. Rapid Damage and Needs Assessment, Gaza Strip, April 2026. https://thedocs.worldbank.org/en/doc/e539cbf23b348c3d4fc69b8a7e9c9d7d-0280062026/
3. World Bank. West Bank and Gaza country overview and recovery context. https://www.worldbank.org/ext/en/country/westbankandgaza
4. United Nations OCHA. Humanitarian Situation Report, 31 July 2026. https://www.ochaopt.org/content/humanitarian-situation-report-31-july-2026
5. World Health Organization. Director-General remarks on humanitarian access and health in Gaza, 24 September 2026. https://www.who.int/news-room/speeches/item/who-director-general-s-remarks-at-the-unga-side-event–humanitarian-access-and-health-in-gaza—ministerial-roundtable—24-september-2026
6. World Health Organization. Health Emergency Appeal 2026. https://cdn.who.int/media/docs/default-source/documents/emergencies/2026-appeals/who-health-emergency-appeal-2026.pdf
7. UNICEF. Gaza Child-Focused Assessment, May 2026. https://www.unicef.org/sop/reports/gaza-child-focused-assessment
8. UNICEF. WASH Humanitarian Situation Update, 29 May 2026. https://www.unicef.org/sop/reports/unicef-state-palestine-humanitarian-situation-update-wash-gaza-strip
9. UNICEF. Children in Gaza need life-saving support, updated August 2026. https://www.unicef.org/emergencies/children-gaza-need-lifesaving-support
10. United Nations Security Council. Resolution 2803 (2025), adopted 17 November 2025. https://digitallibrary.un.org/record/4093207
11. United Nations. Implementation of Security Council resolution 2803 (2025), report of the Board of Peace through the Office of the High Representative for Gaza, S/2026/418, 15 May 2026. https://www.un.org/unispal/document/implementation-of-united-nations-security-council-resolution-2803-2025-report-of-the-board-of-peace-through-the-office-of-the-high-representative-for-gaza-s-2026-418/
12. United Nations Special Coordinator for the Middle East Peace Process. Report to the Ad Hoc Liaison Committee, September 2026. https://www.un.org/unispal/document/unsco-report-to-the-ad-hoc-liaison-committee-september-2026/
13. The White House. Statement on President Trump’s Comprehensive Plan to End the Gaza Conflict, 16 January 2026. https://www.whitehouse.gov/briefings-statements/2026/01/statement-on-president-trumps-comprehensive-plan-to-end-the-gaza-conflict/
14. United Nations. Horizon Fund terms and recovery framework, April 2026. https://www.un.org/unispal/document/horizon-fund-building-a-bridge-to-recovery-and-reconstruction-terms-of-reference-mou-and-faqs-april-2026/
15. World Bank. Financial Intermediary Fund for Gaza Reconstruction and Development, November 2025. https://www.worldbank.org/en/brief/2025/11/25/financial-intermediary-fund-for-gaza-reconstruction-and-development
16. Source document supplied by the requester: RLL Civilizational Repair Engine and Gaza background compilation.
Annex D Responsibility and approval matrix
| Decision | Proposes | Reviews | Approves | Informed |
|---|---|---|---|---|
| Annual strategy and budget | Programme Director | CFO, sector directors and community council forum | NCAG under the Board of Peace compact | Donors, ministries, municipalities and public |
| Project admission to portfolio | Sector Director | Engineering, safeguards, finance and M&E | Programme Investment Committee | Board and relevant community |
| Tender award above $50 million | Procurement Director | Evaluation panel, legal, integrity and independent observer | Board with donor no-objection | Public through contracting portal |
| Contract change above 15 percent | Contract Manager | Independent engineer, finance and procurement | Programme Director and donor | Board audit committee |
| Safeguards high-risk approval | Project Owner | Safeguards Director and independent specialist | Programme Director with donor clearance | Affected communities |
| Tranche release | CFO and Programme Director | Independent verifier and safeguards director | Board and donor or trustee | Public through quarterly report |
| Fraud case closure | Integrity Director | Legal counsel and audit committee | Board audit committee | Relevant donor and competent authority |
Annex E Reporting schedule
| Report | Frequency | Deadline | Minimum content |
|---|---|---|---|
| Operational dashboard | Monthly | 10 working days after month end | Access, outputs, incidents, procurement, cash and bottlenecks |
| Financial and results report | Quarterly | 30 days after quarter end | Budget, commitments, disbursement, outputs, outcomes, safeguards and grievances |
| Independent verification | Quarterly | Before tranche decision | Physical progress, data quality, contract milestones and exceptions |
| Safeguards performance | Quarterly and incident-based | Quarterly plus serious-incident deadlines | Environmental, social, labour, protection, SEA/SH and remedy actions |
| External audit | Annual | Within six months of year end | Financial statements, compliance, internal control and management response |
| Evaluation | Midterm and final | Month 18, year 5 and year 10 | Relevance, effectiveness, efficiency, impact, sustainability and conflict effects |
Annex F Applicant due diligence and submission data room
Legal registration, governing documents, authorized signatories and organizational ownership or control structure.
Three years of audited financial statements, management letters, current budget and evidence of going-concern capacity.
Banking details verified independently, tax status and confirmation of authority to receive and transfer donor funds.
Board and senior-management biographies, conflicts of interest, political exposure and sanctions screening.
Policies and case records for safeguarding, SEA/SH, child protection, whistleblowing, anti-fraud, procurement, data protection and complaints.
Evidence of comparable programme delivery, donor references, contract performance and material disputes or investigations.
Proposed consortium agreements, partner selection, subgrant arrangements and partner capacity-assessment results.
Named key personnel, recruitment plan, salary scale, duty-of-care arrangements and organizational security plan.
Eighteen-month detailed activity budget, procurement plan, cash-flow forecast, cost assumptions and indirect-cost methodology.
Initial project pipeline with locations, readiness, designs, safeguards category, beneficiaries, operators and maintenance funding.
Monitoring plan, indicator protocols, baseline terms of reference, data architecture and independent-verification terms.
Letters or formal records confirming government, municipal, community, access, utility and implementation coordination.
Annex G Priority Starter Portfolio for the first 6 to 18 months
This portfolio provides a donor-ready entry point comparable in function, but not necessarily identical in project count or design, to other Board of Peace starter packages. Each intervention remains conditional on field verification, Palestinian approval, access, security, safeguards, procurement readiness and independent cost appraisal. Cost bands are planning ranges within the existing $26.3 billion eighteen-month envelope and are not additional to it.
| Cluster | Flagship intervention | Window | Planning range | Critical dependency |
|---|---|---|---|---|
| Protection and access | Crossing performance and protected humanitarian logistics system | 0–6 months | $150–300m | Ceasefire, access protocol and monitors |
| Protection and access | Civilian deconfliction, emergency communications and continuity platform | 0–6 months | $75–150m | Party notifications and incident review |
| Protection and access | Explosive-hazard survey and clearance of priority service corridors | 0–18 months | $250–500m | Security access and technical teams |
| Security transition | Weapons registration, safe surrender and verified disposition mechanism | 0–18 months | $50–125m | Political agreement and verifier mandate |
| Security transition | Tunnel mapping and civilian-safe neutralization at priority sites | 3–18 months | $150–400m | Engineering survey and safeguards |
| Governance | NCAG entry, service-continuity and Palestinian civil-service restart package | 0–6 months | $150–350m | Mandates, access and payroll verification |
| Governance | Recovery Delivery Office, open contracting and public dashboard | 0–6 months | $40–90m | NCAG approval and fiduciary systems |
| Governance | Civil, land and property records recovery and secure digital backup | 0–18 months | $80–180m | Data access and legal protocols |
| Feed families | Protected nutrition corridors and transparent commodity tracking | 0–6 months | $350–700m | Crossing throughput and humanitarian coordination |
| Feed families | Community kitchens, school meals and maternal and infant nutrition | 0–18 months | $250–550m | Food supply, kitchens and health referrals |
| Feed families | Cash-for-food and market-affordability stabilization | 0–18 months | $400–900m | Market functionality and payment systems |
| Feed families | Bakeries, food markets, cold chain, agriculture and fisheries restart | 3–18 months | $350–800m | Energy, inputs, access and working capital |
| Water and sanitation | Emergency water production, network repair and household safety | 0–12 months | $600m–1.2bn | Fuel, power, materials and water testing |
| Water and sanitation | Priority wastewater, drainage and solid-waste restoration | 3–18 months | $500m–1.0bn | Engineering survey and safe works corridors |
| Health | Primary care, medicines, maternal health and referral continuity | 0–18 months | $450–900m | Supplies, workforce and evacuation protocol |
| Health | Prosthetics, rehabilitation, mental health and grief care network | 0–18 months | $250–600m | Specialist staff and referral pathways |
| Celebrate children | Child-safe learning, play and creative-recovery centres | 0–12 months | $300–650m | Safe sites, educators and safeguarding |
| Celebrate children | Teacher continuity, accelerated learning and school feeding | 0–18 months | $400–850m | Teacher roster, materials and food supply |
| Celebrate children | Accessible play gardens, therapeutic sports and mobile libraries | 3–18 months | $120–300m | Neighbourhood plans and inclusive design |
| Honor the deceased | Missing persons, forensic recovery, identification and family liaison | 0–18 months | $100–250m | Rubble protocols, records and forensic capacity |
| Honor the deceased | Dignified burial, grave-site protection and community memorials | 0–18 months | $50–150m | Family consent, religious and municipal leadership |
| Housing | Structural assessment, emergency repair and tenure-protected return | 0–18 months | $1.5–3.5bn | Clearance, claims and materials |
| Livelihoods | Recovery jobs, enterprise grants and local procurement facility | 0–18 months | $700m–1.5bn | Banking, transparent intake and market access |
| Energy and resilience | Solar and storage for clinics, water, schools and food cold chains | 3–18 months | $400–900m | Equipment access and operators |
| Social repair | Community mediation, truth documentation and responsible media | 3–18 months | $75–200m | Civic partners, protection and due process |
| Assurance | Independent verification, audit, safeguards and public complaints system | 0–18 months | $75–175m | Access to records, sites and complainants |
Portfolio selection rule.
The first financed package must contain life-saving access, family nourishment, water, health, childhood restoration, deceased and missing persons support, Palestinian institutional continuity, independent assurance and locally generated work. Large permanent construction enters only after safety, tenure, operations and maintenance, environmental and financing conditions are verified.
Review the complete proposal offline
Download the original Word document with the full programme narrative, budgets, delivery plans, safeguards and annexes.